CO Number 1 
A general shot of the server room from the door.
A general shot of the server room from the door.

The telephone company's (clec) equipment racks.  The top left half has our fiber mux, the middle and right racks are the CopperCom phone switch.
The telephone company's (clec) equipment racks. The top left half has our fiber mux, the middle and right racks are the CopperCom phone switch.

Old servers from an ISP we purchased that are currently not in use.
Old servers from an ISP we purchased that are currently not in use.

A pile of Lucent Pormaster 3's and a few PM2's with a few routers, csu's, etc also from the isp we purchased.
A pile of Lucent Pormaster 3's and a few PM2's with a few routers, csu's, etc also from the isp we purchased.

The ISP's 3 equipment racks.
The ISP's 3 equipment racks.

Another shot of the ISP's racks.  Exciting.
Another shot of the ISP's racks. Exciting.

Where the fiber comes into our building.  It brings a tear to my eye.
Where the fiber comes into our building. It brings a tear to my eye.

A closeup of the top of the ISP's left rack.   The top router is for dsl, the middle two routers were taken out of service, our core switch, and the bottom router for backbone.
A closeup of the top of the ISP's left rack. The top router is for dsl, the middle two routers were taken out of service, our core switch, and the bottom router for backbone.

The ISP's main RAS equipment, US Robotics Total Control units.  The telco's cubix server is sitting below them.
The ISP's main RAS equipment, US Robotics Total Control units. The telco's cubix server is sitting below them.